Water Flow
In most cases (for 1.5” and 2” PVC) the total water flow can
be directed through the Cell Housing as shown in Sketch
3a) without significantly affecting the flow rate and/or back-
pressure on the filter, etc. However, if flow rate is a concern
(high horse-power pump, large diameter piping, etc.), the
Cell’ can be installed on a by-pass (as shown in Sketch 3b).
Note the need for a valve to ensure a good flow of water
through the cell.
Helpful HINT
: When attaching the Cell Housing into the
pipework, attach the inlet and outlet pipes to the Cell
Housing FIRST – and then connect that assembly to the rest
of the pipework (Refer Sketch #2). The inlet and outlet pipes
should be pushed in, twisted, and held firmly in place until
the PVC solvent holds. Note: While making these joints,
hold the Cell Housing horizontally, with the inlet and outlet
pointing down, so that the liquid PVC solvent does not run
into the Cell Housing where it will look unsightly through the
clear plastic.
Helpful HINT: Copper Pipes? Use PVC ‘Flow-Lock’ fittings
(compression fittings) for easy connection of PVC to
copper pipes.
Cell Cord
Black
Blue
Black
Low Voltage
Raceway
Connecting the cell cord to the cell
1. Reinstall the cell back into the cell housing.
2. Install the BLUE connector from the cell power cord
onto the threaded bolt with the blue ring on the back of
the cell.
3. Install the two BLACK connectors from the cell power
cord onto the rods with the black fittings on the back of
the cell.
Connecting the cell to the system control center
1. Run the cell cord back to the System Control Center.
2. Connect the stripped wires of the cell cord to the 3-
position terminal block just inside the entrance of the
low-voltage raceway. The BLACK wires can be connected
to either terminal marked black. The BLUE wire is
connected to the terminal marked blue.
This completes installation of the chlorine cell. Important
information on initial operation of the chlorine generator will
be found in the start-up section in this manual.
Fig. 29 Chlorine Generator Cell Location in Plumbing
Fig. 30 Chlorine Cell Cord Wiring
Ball Valve